[1]
Rahman, H. et al. 2014. EFFECTIVE WAY TO ESTIMATE THE STANDARD MINUTE VALUE (SMV) OF A T-SHIRT BY WORK STUDY. European Scientific Journal, ESJ. 10, 30 (Oct. 2014). DOI:https://doi.org/10.19044/esj.2014.v10n30p%p.